Long Lead Systems

View as Grid List
Sort by
Display per page

Stainless Works 1 7/8" x 3" w/ Off-Road Lead Pipes (Long Lead)

2015-17 Mustang GT 5.0L long-tube headers. Unholy Union. Starting with our durable ⅜” thick flanges into 1-⅞” diameter primaries, 3” slip-fit collectors with merge spike, then fitting into 3” catted or offroad leads. Extended leads are built to fit MBRP and Corsa as well as SW Factory cat-back systems. The ultimate freedom in aftermarket connections! No-kinks CNC mandrel belt pipes give a boost of power and longevity with our Lifetime Warranty on our beautiful 304 stainless steel. These are for CORSA, MBRP, and Stainless Works EXHAUST!
$1,401.25

Stainless Works 1 7/8" x 3" w/ Catted Lead Pipes (Long Lead)

2015-17 Mustang GT 5.2L long-tube headers. Unholy Union. Starting with our durable ⅜” thick flanges into 1-⅞” diameter primaries, 3” slip-fit collectors with merge spike, then fitting into 3” catted or offroad leads. Extended leads are built to fit MBRP and Corsa as well as SW Factory cat-back systems. The ultimate freedom in aftermarket connections! No-kinks CNC mandrel belt pipes give a boost of power and longevity with our Lifetime Warranty on our beautiful 304 stainless steel. For SW, CORSA, MBRP exhaust!
$1,591.25

Stainless Power 1 7/8" x 3" w/ Catted Lead Pipes (Long Lead)

2015-17 Mustang GT headers with 1-7/8" primary tubes, 3" diameter lead pipes and high flow catalytic converters designed to connect to an Unholy Union. Tig welded 304 stainless steel headers with 3/8" thick flanges and 3" diameter slip fit collectors with merge spikes. This system is designed to work with Stainless Works 2015+ Mustang aftermarket connect exhausts, which include MBRP, Corsa and SW Factory Catbacks. Our Stainless Power headers are backed by a 24-Month guarantee on material and workmanship.
$1,192.25

Stainless Power 1 7/8" x 3" w/ Off-Road Lead Pipes (Long Lead)

2015-17 Mustang GT headers with 1-7/8" primary tubes, 3" diameter lead pipes and off-road pipes designed to connect to an Unholy Union. Tig welded 304 stainless steel headers with 3/8" thick flanges and 3" diameter slip fit collectors with merge spikes. This system is designed to work with Stainless Works 2015+ Mustang aftermarket connect exhausts, which include MBRP, Corsa and SW Factory Catbacks. Our Stainless Power headers are backed by a 24-Month guarantee on material and workmanship.
$1,002.25